Swale number 3
With winter coming on our main focus has been to arrange for a water tank to be installed so we have measured the shed guttering and decided where the tank is to be located, now we just need to to order the tank and to arrange for sand to be delivered for the base.
During the Foundation Day long...
Read more...


