Logo primary
Logo secondary
Klien Karoo Sustainable Dryland Permaculture Project
Klien Karoo Sustainable Dryland Permaculture Project
Details
Commenced:
01/01/1999
Submitted:
22/04/2011
Last updated:
07/10/2015
Location:
PO Box 189, Ladismith, Western Cape, ZA
Phone:
027 - (0)28 55 11 678
Website:
www.berg-en-dal.co.za
Climate zone:
Arid





My Projects

(projects i'm involved in)


Followers
Abraham Coetzee ALESSANDRO BALDASSARI Alex Kruger Alexandra Dryer Annetjie Pocock Charl Laing chez brown Christine Bauer Claire Coleman Clement HUYGHE Damian Lester Dom Doyle Emil Hasanov Fraser Roberts Gavin Stockden Gerald Anderson Gurjeet Kaur Hubert de Kalbermatten Jacques Joubert Jean Rossouw Jeannnie Viljoen-Davidoff Justin Bramhall Kana Knox Karen de Vries Karen De Vries karen noon Kayla Kidd Khai  Galias Klifford J Fyshwick Laureene Reeves Ndagire Levi Maxwell Lily Bunker Linda Wiseman Line Marie Elkjær Johansen Ludovic Bourdon Luke Smith Marcus Pan Melissa Andrews Myra Graham neil graham Neil Silverhair Nicholas Holmes Nicole Caran Niki Neave paul barker Piet Bosman Randy Monk Raymond Myburgh Rika Scheepers rob durham Robert Grau Ruan Botha Ryan Allan Ryan Botha Ryno le Grange Saleh Achhala Sally Landers Sarah Baleiza Sarvesvara Dasa Sasha Ivanovic Shaun Kotze Somesh De Swardt Sue Spies Tracy Saunders Vaughn Cross Verity Bachmann Warwick Metcalfe Woody Meyer Xavier Francis yannick srodawa-wenger Yvandro Reynolds

Back to Klien Karoo Sustainable Dryland Permaculture Project

Water infrastructure

Project: Klien Karoo Sustainable Dryland Permaculture Project

Posted by Alex Kruger over 13 years ago

New dam is rocking!

Our project was funded through the Threshold Foundation to make a 17 million litre surface dam. After the dam was completed, we entered into a two year drought - the worst in decades!

Our fold mountain landscape does not leave much opportunity for Keyline implementation, but we managed to create a small keyline dam, with a keyline running down to a much larger storage. This storage is also fed swale overflow via a much smaller, higher surface dam, which pushes back into a canal that then leads excess water to the main dam.

A 50 mm downpour (in 90 mins) in February had water rushing like a waterfall via the keyline into said dam. Hoever it did not fill much, and rapidly evaporated in the scorching summer.

In July we experienced a slower gentler 124 mm in two or three days, and the big dam was full in 3 days! We can now start looking at Zone 3 agriculture.

Very exciting watching the water harvesting sytems working together like a well conducted orchestra.

 

Comments (1)

You must be logged in to comment.

Klifford J Fyshwick
Klifford J Fyshwick : Hi from Australia would love to see some pics,sounds great
Posted over 12 years ago

Report Klifford J Fyshwick on Water infrastructure

Reason:

or cancel

Courses Taught Here!
Project Badges
Rural Intentional Demonstration Educational
Administrators
Alex Kruger - Admin Kent Muhammad Tahir Cooper - Admin
Team Members

Report Klien Karoo Sustainable Dryland Permaculture Project

Reason:

or cancel

Hide Klien Karoo Sustainable Dryland Permaculture Project

Reason:

or cancel

Hide Water infrastructure

Reason:

or cancel

Legend of Badges

Note: The various badges displayed in people profiles are largely honesty-based self-proclamations by the individuals themselves. There are reporting functions users can use if they know of blatant misrepresentation (for both people and projects). Legitimacy, competency and reputation for all people and projects can be evidenced and/or developed through their providing regular updates on permaculture work they’re involved in, before/after photographs, etc. A spirit of objective nurturing of both people and projects through knowledge/encouragement/inspiration/resource sharing is the aim of the Worldwide Permaculture Network.

Member

Member

A member is a permaculturist who has never taken a PDC course. These cannot become PDC teachers. Members may be novice or highly experienced permaculturists or anywhere in between. Watch their updates for evaluation.

Male memberFemale member

Permaculture Matchmaker

One of these badges will show if you select your gender and the "I'm single, looking for a permaculture partner" option in your profile.

unverified

PDC

People who claim to have taken a Permaculture Design Certificate (PDC) course somewhere in the world.

verified

PDC Verified

People who have entered an email address for the teacher of their PDC course, and have had their PDC status verified by that teacher. Watch their updates for evaluation.

pri_verified

PRI PDC

People who’ve taken a Permaculture Research Institute PDC somewhere in the world.

pdc_teacher

PDC Teacher

People who claim to teach some version of PDC somewhere in the world.

pri_teacher

PRI Teacher

With the exception of the ‘Member’ who has never taken a PDC, all of the above can apply to become a PRI PDC Teacher. PRI PDC Teachers are those who the PRI recognise, through a vetting board, as determined and competent to teach the full 72-hour course as developed by Permaculture founder Bill Mollison – covering all the topics of The Designers’ Manual as well as possible (i.e. not cherry picking only aspects the teacher feels most interested or competent in). Such teachers also commit to focussing on the design science, and not including subjective spiritual/metaphysical elements. The reason these items are not included in the PDC curriculum is because they are “belief” based. Permaculture Design education concerns itself with teaching good design based on strategies and techniques which are scientifically provable.

PRI PDC Teachers may be given teaching and/or consultancy offerings as they become available as the network grows.

pri_teacher

Aid Worker

The individual with this badge is indicating they are, have, or would like to be involved in permaculture aid work. As such, the individual may or may not have permaculture aid worker experience. Watch their updates for evaluation.

pri_teacher

Consultant

The individual with this badge is indicating they are, have, or would like to do paid permaculture design consultancy work. As such, the individual may or may not have permaculture consultancy experience. Watch their updates for evaluation.

community

Community Project

Community projects are projects that help develop sustainable community interaction and increase localised resiliency.

Report Water infrastructure

Reason:

or cancel